Activities of the Import Company
- Prepare 500KVA generators for the Ministry of Science and Technology of Turkey origin provided by Gen Power
- Preparing 500KVA generators for the Ministry of Science and Technology of Swiss origin provided by General Electric
- Preparing communications equipment for High Link Co, which includes 50 connection tower (ROOF TOP) up to 18m of Turkey origin
- Preparing of solar lighting systems of U.S. origin with the inauguration of SABCO America and the quantity of 740 is equipped with an integrated system of columns, up to 11m from Turkey
- Preparing of electrical transformer equipment in different sizes for the ANBAR province, the origin of a Jordanian company Alco
- Preparing of 390 PCs and 175 Laptop for the AL-ANBAR university
- Preparing cables of various sizes for MAHALA project 310 and 315 in ADHAMIYA and within the international standards
- Preparing of 52 generators of 30KVA with special qualification for High Link Co.
- Preparing of 100 pieces of SPLIT UNIT 2.5 tons for High Link Co.
- Preparing of 75 SHELTER cabins for keeping communication devices that is within the international standards
- Preparing of plastic tubes of different sizes for the benefit of ANBAR province from the origins of Jordanian and Saudi Arabia and China
- Preparing and installation, interconnection and operation of communications towers of different heights from 60m to 90m for the AL-CATEL company within the project of the French MICRO WAVE from Abu GHRAIB to TREBIL
- Desalination plants the size of 200m, equivalent to 3 million gallons for the ANBAR province
- URO Italian Company produces water purification plants (RO)